Try the new Beta.Halton.ca

Operating Instructions for the Bulk Water Stations

New online pre-payment system

A new online pre-payment system and keypad terminal has replaced Halton’s Smart Card payment and reader system. Please click here to set up a new online account or access an existing Flowpoint account. For more information, call 311.

IMPORTANT:

The Nipissing Road coin-operated bulk water station closed permanently on May 31, 2018.

Be respectful of the community...

The region asks that bulk water customers using the service be respectful of quiet periods in the surrounding communities, and that bulk water truck operators recognize and obey standard traffic safety regulations.

Step-by-Step Operating Instructions

  1. Approach the bulk water dispensing station slowly, at low speed, and park your truck in the proximity of the filling connection. Make sure that your vehicle does not block traffic. Turn your engine off.
  2. For bottom filling - Unpack your low-level hose connection and connect to the male camlock filing connection. Use adaptors if necessary.
  3. For top filling - Assure your cistern (tank) hatch is open and the hose extension outlet of the loading arm is pointing towards the opening.
  4. Please follow the prompts on the display panel to enter your 4-digit Access number and 4-digit PIN associated with your online account. Click here to learn how the new keypad terminals work.
  5. You may stop the transaction at any time by pressing "Stop or Pause".
  6. At the conclusion of the transaction, the LCD display will indicate the remaining account balance in cubic meters available.
  7. Please close the door and engage the latch to protect the terminal from the elements before leaving the site.

top of page

Procedures for Abnormal Conditions

Abnormal operating conditions may occur during:

  • Cold weather or snow storms.
  • Freezing rain or severe rainfall.
  • High wind.
  • Blackouts or at night.
  • Equipment malfunction
  • High flow rates.

Should you experience difficulties operating the station, refer to the instructions mounted on the control cabinet access door.

Winter Conditions

Each bulk water station is equipped with a salt box. The Region's maintenance staff ensures that the salt box has salt or salt alternatives in it at all times.

Snow removal is done by area municipal road crews. Some hand shovelling may be required to access the smart card terminal to turn the water on. Please be extra cautious while operating on ice or during freezing rain, severe rainfall or high wind.

Prepare your vehicle for operation under winter conditions ahead of time. Check the latest weather reports by visiting the Environment Canada Weather Office website External link.

Some useful tips on how to prepare your vehicle for operation under winter conditions can be found on the Ontario Weather page External link.

High Flow Periods

The Region experiences higher water consumption rates in the morning, between 7 a.m. and 9 a.m., and in the evening, between 5 p.m. and 9 p.m.

During these periods of high water consumption, the truck operator might experience a small drop in pressure at some locations while filing the tank with water. Therefore, the transaction may take a few more minutes than usual to complete.

top of page

Contamination Protection

The owner and/or operator of a water hauling truck should take appropriate measures to protect the water, the water tank, and any equipment and connections from contamination during filling, storage, transportation, and delivery of the bulk water. This includes:

  • Covering hoses and nozzles when not in use.
  • Disinfecting and sanitizing equipment before each use.
For general information or technical support for Halton's bulk water stations please call Access Halton at 905-825-6000.

top of page