Skip Navigation

Municipal Class Environmental Assessment Studies

Breadcrumbs

Junction Street Wastewater Pumping Station Class EA Study

Status:

Completed

Consultant:

Black & Veatch Canada

Regional Contact:

accesshalton@halton.ca

Details

Purpose:

To consider a wide range of wastewater pumping station (WWPS) and collection system upgrades in order to service growth in the City of Burlington to 2031.

Scope:

This Class EA study will include:

  • Review options to upgrade the WWPS and collection system to service growth to 2031
  • Evaluation of alternative solutions
  • Assessment of the impacts and identification of mitigation measures
  • Public and review agency consultation
  • Prepare the Project File for review and approval

If you require the following documents in an alternate format, please call 311, TTY: 905 827-9833 or e-mail accesshalton@halton.ca.

TOP