Skip Navigation

Municipal Class Environmental Assessment Studies

Breadcrumbs

Ninth Line Corridor Study – Highway 407 to 10 Side Road

Status:

Completed

Consultant:

Urban & Environment Management Inc.

Regional Contact:

accesshalton@halton.ca

Details

Purpose:

To consider a wide range of options for transportation corridor improvements to satisfy future travel demands to 2031.

Scope:

Halton Region will examine a wide range of road improvement alternatives in order to best address travel demand along Ninth Line that will include widening of the roadway, cross-sectional improvements, active transportation and over-all traffic operations.

If you require the following documents in an alternate format, please call 311, TTY: 905 827-9833 or e-mail accesshalton@halton.ca.

Project Documents

TOP