Skip Navigation

Municipal Class Environmental Assessment Studies

Breadcrumbs

Steeles Avenue Corridor Study – Tremaine Road to Industrial Drive

Status:

Completed

Consultant:

WSP|MMM Group

Regional Contact:

accesshalton@halton.ca

Details

Purpose:

To consider options for road improvements along the Steeles Avenue Corridor.

Scope:

Halton Region will examine a wide range of road improvement alternatives in order to best address public safety and future 2031 travel demand along Steeles Avenue as part of the study, including intersection operations, active transportation, structural and drainage. The impact of alternatives on social, cultural, economic and natural environments will also be evaluated and assessed during the study.

An online Public Information Centre (PIC) took place between April 15 and May 17, 2021. Details of the PIC can be reviewed here: Online Consultation: Steeles Avenue MCEA

If you require the following documents in an alternate format, please call 311, TTY: 905 827-9833 or e-mail accesshalton@halton.ca.

Project Documents

TOP