Bridge and Culvert Improvement Program

About this project

Halton Region continues to maintain and upgrade existing bridges and culverts. Our multi-year Bridge and Culvert Improvement Program ensures that bridge and culvert infrastructure are in a state of good repair which may include improvements to creek embankments, safety barriers (parapet walls), pedestrian/cyclist railings, and guide rails. It also ensures roads on top of culverts and bridges are resurfaced as needed.

A bridge and culvert are identified as:

Bridge

A structure which provides a roadway or walkway for the passage of vehicles, pedestrians or cyclists across an obstruction or gap.

Culvert

A pipe or small structure which allows for the conveyance of water under a roadway or walkway.

Project details

  • Location: Burlington, Oakville, Halton Hills and Milton
  • Benefits: Bridge and Culvert Improvement Program ensures that bridge and culvert infrastructure are in a state of good repair
  • Project #: PR-3380

Project map

Project timeline

2024 Program Details

Spring 2024

Anticipated Construction start

Spring 2025

Anticipated Construction end

2025 Program Details: Contract 1

Summer 2025

Construction start

2025-2026

Anticipated construction period

Spring 2026

Anticipated construction end

2025 Program Details: Contract 2

Summer 2025

Anticipated Construction Start

2025-2027

Anticipated construction period

Fall 2027

Anticipated Construction End

Latest traffic updates and notices

Traffic updates

There are no traffic updates at this time.

Sign up for email updates on Regional improvements

Stay up-to-date

Halton Region has a dedicated Construction Ambassador for this project who will be available to meet with residents and businesses to address any questions or concerns.

You can also stay connected by: