Online Consultation: Regional Road 25 Municipal Class Environmental Assessment Study


About the project

Study overview

To improve network connectivity and address forecasted travel demand along Regional Road 25 from Speers Road to Derry Road (Regional Road 7), the Region is considering a wide range of improvements, such as:

  •   Widening the roadway
  •   Cross-sectional requirements to accommodate multi-modal travel
  •   Active transportation
  •   Transit supportive infrastructure
  •  Intersection improvements
  •   Overall traffic operations and safety
  •   The impact of such improvements on the social, cultural and natural environments

The study is being conducted in accordance with the planning and design process for Schedule C projects as outlined in the Municipal Class Environmental Assessment (external link) (October 2000, as amended 2007, 2011, 2015 and 2023), which is approved under the Ontario Environmental Assessment Act, RSO. 1990.

The online consultation for Public Information Centre #1 took place between October 12 and November 9, 2023. The presentation and transcript are available on the MCEA project page.

Study area

Public Information Centre materials

A second Public Information Centre took place between June 19 and July 17, 2025. To learn about the study findings so far, please watch or listen to the videos below. You can also access a PDF copy of the presentation (PDF file).

1. Introduction

Learn about the purpose of this PIC, what the study is about, the process and schedule, and what we heard at PIC #1.

View introduction video transcript (PDF file)

2. Development of Preliminary Preferred Design

Learn about the development of the preliminary design elements, including active transportation (walking and cycling) facilities, typical cross-sections, road alignment, transit infrastructure and intersection improvements.

View the development of the preliminary design video transcript  (PDF file)

3. Preliminary Preferred Design

Learn about the preliminary preferred design for Regional Road 25.

View preliminary preferred design video transcript  (PDF file)

4. Next steps

Learn about the next steps for the Regional Road 25 MCEA Study.

View next steps video transcript (PDF file)

Share your feedback

To find background information or download copies of notices and reports:

Contact us to join the study mailing list or if you need an alternate format:

Next steps and anticipated timing

Timeline
Late Fall 2023

Review all comments and feedback on the existing conditions and preferred solution.

Winter 2024

Develop and evaluate alternative design concepts and identify preliminary preferred design. Meet with technical agencies and stakeholder groups, as required.

Spring 2025

Host the second PIC.

Summer 2025

Review all comments and feedback on the preliminary preferred design for each corridor and prepare the Environmental Study Report(s) to document the decision-making process.

Fall 2025/Winter 2026

Issue the Notice of Completion and start of the 30-day review of the Environmental Study Report.